Interior design

Developing a bathroom, kitchen, attic or veranda can improve the comfort of residents. Update on the various steps in order to better plan your work and achieve the development that corresponds to your project and your budget.

The steps of an interior design

Developing a bathroom, kitchen, attic or veranda can improve the comfort of residents. This is sometimes an opportunity to gain additional square meters, creating, for example, a master suite under the roof.

A well-appointed home also attracts buyers more easily if the property is sold. But, whatever your goals, for successful work, you will have to respect the steps of an interior design.

Interior design: several phases

House or apartment development work seems less difficult than heavy renovations to the structural work. However, they need to fully understand his desires and eventually find compromises, depending on the technical possibilities and your budget.

It is also necessary to take the time to plan the work especially if several bodies of state (mason, painter, plumber, for example) intervene. In general, to plan the steps of an interior layout, it is best to start with the floor before going to joinery and eventually to plumbing and electricity, to finish with wall coverings.

Applying to a professional development is the guarantee of work well done and sometimes even save money. This specialist, experienced in the organization of interior design Singapore work will select the materials presenting the best value for money and will often succeed in smoothing the difficulties, including coordinating all stages of development.

You can hire a craftsman specializing in the layout of a particular room, such as a kitchen designer or a bathroom designer. But you can also call on interior design Singapore. The latter, in addition to presenting you with an overview of the project, will be authorized to conduct certain works related to the structure (opening of walls, load-bearing walls, etc.).

Interior design: project premises and plans

The interior design Singapore arranges the different elements that make up your space. It takes into account a large number of parameters, such as the facade and furniture but also your tastes and your budget. He makes plans perfectly legible by the companies intervening on the building site. The interior designer can also assist you in the choice of professionals.

The cost of the intervention of such professionals will depend as much on the characteristics of the project as on their own fees (usually based on the area of ​​practice and the reputation of the professional). It is therefore advisable to ask for several quotes, possibly accompanied by references from previous projects. However it is possible to give the following budget benchmarks:

Finally, for the follow-up and the coordination of the works, a fixed price can be applied according to the amount of the work of interior design. But, architects generally prefer to calculate a percentage on the tax-free amount of the work.

Steps of an interior layout: construction site

During the actual construction phase, it is important to monitor the schedule and possibly react immediately if there is a problem. It will be impossible for the painter to intervene if the electrician has not finished his performance. A professional coordinator, like the interior design Singapore, is able to cope with this type of difficulty related to the sequence of stages of an interior design.

The cost of an interior layout depends a lot on the room and type of renovation planned, economic renovation or upscale renovation. Here are some ideas for average budgets depending on the planned development work:

Steps in interior design: reception of works

The reception of the works is an essential phase which closes your building sites. This last stage of the interior design consists, indeed, to declare the completed works with or without reserve.

The ideal is to benefit from the expert eye of an interior designer. If you receive your interior design site alone, you will have to call all the companies involved in the construction site to conduct a contradictory reception. This is the starting point of the decennial insurance, which must be underwritten by each stakeholder.

At this reception, you will establish reception PVs. If some development work does not comply, it must be reported on the PV. This is what building professionals call “reserves”. The company will then have one year to come to achieve compliance (year of perfect completion).

Failing to note the apparent defects at the end of the development, you are deemed to have accepted. Note: if you have difficulty in formulating the visible disorders in technical terms, you can take pictures of them in addition to describing them in writing.

Interior design stage: not to be neglected

The construction site of your living space is almost finished; you have to think about the finishes. If your budget is a bit fair, it is advisable to focus on the fixed parts. An example: for joinery closing the access of your new attic can include a quality frame and a first price door to change, when your finances will allow you.

In any case, it would be a pity to spoil a successful interior design with sloppy finishes for lack of time and / or financial means.

The ideal is therefore to integrate interior finishing work into your original budget and to allow a little time at the end of the work schedule, to install a plinth, install lights on your light sources, ask the covers of your sockets and switches … Steps often forgotten or neglected.